Existing brick fire surround in clients converted stables.
New chimney breast constructed with more appropriate exit for twin wall flue system.
The old reclaimed flags are layed, these were milled down and cut to size fitting perfectly with in the parquet boarder.
The jambs are fitted along with the bricks from the original fire surround which are used to line the rear of the opening and side returns.
Corbels, head and stove all installed and ready for plastering.
And finally the transformation is complete. A new fire surround in Fletcher Bank gritstone with old flagged hearth.
Existing brick fire surround in clients converted stables.
New chimney breast constructed with more appropriate exit for twin wall flue system.
The old reclaimed flags are layed, these were milled down and cut to size fitting perfectly with in the parquet boarder.
The jambs are fitted along with the bricks from the original fire surround which are used to line the rear of the opening and side returns.
Corbels, head and stove all installed and ready for plastering.
And finally the transformation is complete. A new fire surround in Fletcher Bank gritstone with old flagged hearth.
Existing brick fire surround in clients converted stables.
New chimney breast constructed with more appropriate exit for twin wall flue system.
The old reclaimed flags are layed, these were milled down and cut to size fitting perfectly with in the parquet boarder.
The jambs are fitted along with the bricks from the original fire surround which are used to line the rear of the opening and side returns.
Corbels, head and stove all installed and ready for plastering.
And finally the transformation is complete. A new fire surround in Fletcher Bank gritstone with old flagged hearth.
Existing brick fire surround in clients converted stables.
New chimney breast constructed with more appropriate exit for twin wall flue system.
The old reclaimed flags are layed, these were milled down and cut to size fitting perfectly with in the parquet boarder.
The jambs are fitted along with the bricks from the original fire surround which are used to line the rear of the opening and side returns.
Corbels, head and stove all installed and ready for plastering.
And finally the transformation is complete. A new fire surround in Fletcher Bank gritstone with old flagged hearth.
Existing brick fire surround in clients converted stables.
New chimney breast constructed with more appropriate exit for twin wall flue system.
The old reclaimed flags are layed, these were milled down and cut to size fitting perfectly with in the parquet boarder.
The jambs are fitted along with the bricks from the original fire surround which are used to line the rear of the opening and side returns.
Corbels, head and stove all installed and ready for plastering.
And finally the transformation is complete. A new fire surround in Fletcher Bank gritstone with old flagged hearth.
Original fireplace, canopy, extended hearth and built in cupboards.
Starting to dismantle and take up the hearth.
The first of four bulk bags of rubble !
Removal of old birds nests and taking out bricks above the existing lintol so that we can make the opening bigger.
New opening and new supporting lintol ... propped while everything goes off.
Hearths, jambs and corbels installed and the stone in the rear of the opening is being built up.
The head of the fire surround is installed and ...
The finished project !
Original fireplace, canopy, extended hearth and built in cupboards.
Starting to dismantle and take up the hearth.
The first of four bulk bags of rubble !
Removal of old birds nests and taking out bricks above the existing lintol so that we can make the opening bigger.
New opening and new supporting lintol ... propped while everything goes off.
Hearths, jambs and corbels installed and the stone in the rear of the opening is being built up.
The head of the fire surround is installed and ...
The finished project !
Original fireplace, canopy, extended hearth and built in cupboards.
Starting to dismantle and take up the hearth.
The first of four bulk bags of rubble !
Removal of old birds nests and taking out bricks above the existing lintol so that we can make the opening bigger.
New opening and new supporting lintol ... propped while everything goes off.
Hearths, jambs and corbels installed and the stone in the rear of the opening is being built up.
The head of the fire surround is installed and ...
The finished project !
Original fireplace, canopy, extended hearth and built in cupboards.
Starting to dismantle and take up the hearth.
The first of four bulk bags of rubble !
Removal of old birds nests and taking out bricks above the existing lintol so that we can make the opening bigger.
New opening and new supporting lintol ... propped while everything goes off.
Hearths, jambs and corbels installed and the stone in the rear of the opening is being built up.
The head of the fire surround is installed and ...
The finished project !
Original gas fire and tiled fireplace.
Making preparations for the new fire surround by creating a larger opening.
Incorporating a new supporting lintol.
Chimney breast extended and plasterboard fixed. Inner hearth goes down.
Outer hearth is installed and the beginning of the stone ashlar back.
Chimney breast is plastered ready for the installation of the new fire surround.
A beautiful new Dovedale fire surround in Bath Stone.
Original gas fire and tiled fireplace.
Making preparations for the new fire surround by creating a larger opening.
Incorporating a new supporting lintol.
Chimney breast extended and plasterboard fixed. Inner hearth goes down.
Outer hearth is installed and the beginning of the stone ashlar back.
Chimney breast is plastered ready for the installation of the new fire surround.
A beautiful new Dovedale fire surround in Bath Stone.
Original gas fire and tiled fireplace.
Making preparations for the new fire surround by creating a larger opening.
Incorporating a new supporting lintol.
Chimney breast extended and plasterboard fixed. Inner hearth goes down.
Outer hearth is installed and the beginning of the stone ashlar back.
Chimney breast is plastered ready for the installation of the new fire surround.
A beautiful new Dovedale fire surround in Bath Stone.
Original gas fire and tiled fireplace.
Making preparations for the new fire surround by creating a larger opening.
Incorporating a new supporting lintol.
Chimney breast extended and plasterboard fixed. Inner hearth goes down.
Outer hearth is installed and the beginning of the stone ashlar back.
Chimney breast is plastered ready for the installation of the new fire surround.
A beautiful new Dovedale fire surround in Bath Stone.
Original gas fire and tiled fireplace.
Making preparations for the new fire surround by creating a larger opening.
Incorporating a new supporting lintol.